Tip 1 : Do not rush into things. Learning takes time. Focus should be on the concepts and not just on leaving topics half-prepared. Devote 70% of both time and effort to DSA. I solved a total of around 500 questions on sites like GFG and Leetcode. Do not repeat similar questions just to increase the count of the number of questions
Tip 2 : Competitive Programming is a bonus and not a necessity, rather focus on core DSA based problems before trying CP. Do not pursue CP if you do not like it. Devote that extra time to core CS subjects and aptitude preparation.
Tip 3 : Projects play an important role too, do no ignore them. Try to get your hands dirty with a little bit of every field i.e., frontend, backend, and database.
Tip 1 : Try to make a single-page resume. Highlight skills, projects, and work experience more than CGPA. Ensure proper spacing and font to maintain professionalism.
Tip 2 : Do not lie on a resume. Everything written on your resume must be known by you in and out.
Given a string (STR) of length N, you have to create a new string by performing the following operation:
Take the smallest character from the first 'K' characters of STR, remove it from STR and append it to the new string.
You have to perform this operation until STR is empty.
Given an array of numbers, find the maximum sum of any contiguous subarray of the array.
For example, given the array [34, -50, 42, 14, -5, 86], the maximum sum would be 137, since we would take elements 42, 14, -5, and 86.
Given the array [-5, -1, -8, -9], the maximum sum would be -1.
You are given an array/list of ‘N’ integers. You are supposed to return the maximum sum of the subsequence with the constraint that no two elements are adjacent in the given array/list.
You have been given a long type array/list 'ARR' of size 'N'. It represents an elevation map wherein 'ARR[i]' denotes the elevation of the 'ith' bar. Print the total amount of rainwater that can be trapped in these elevations.
You are given an unweighted directed graph of 'V' vertices and 'E' edges. Your task is to print all the strongly connected components (SCCs) present in the graph.